24.0126 Commission not authorized to specify equipment.

Print This

Nothing in 24.0115 through 24.0127 shall be construed to authorize the Commission to require the use of machinery, devices or equipment from a particular supplier or produced by a particular manufacturer if the required performance standards may be met by machinery, devices, or equipment otherwise available.

History: 1972, PL 12-45 § 1, 2000, PL 26-22.