Chapter 02 - Electric Service
12.0201 Service generally-Utility defined-Rate review. (a) Electric power is generated and distribut… |
12.0202 Bill payment-Late penalty. (a) Payment shall be due on the date shown on… |
12.0203 Disconnection for nonpayment-Reconnection. (a) If the bill becomes delinquent, the servi… |
12.0204 Connections. All final connections, permanent or temporary… |
12.0205 Tampering with meters and conductors-Breaking seals. (a) Tampering with the meter or with conducto… |
12.0206 Alterations and additions to electrical equipment installations. When the utility connects a customer’s instal… |
12.0207 Liability limits of utility-Three-phase circuit protection. (a) Thc utility will endeavor to furnish cont… |
12.0208 Phasing failure and protection. Delivery of single-phase power to a 3-phase m… |
12.0209 Resale of energy. The customer shall not resell any of the elec… |
12.0210 Limit of utility responsibility. The primary delivery point shall be the pole… |
12.0211 Trouble calls. The utility is responsible for maintaining el… |
12.0212 Meter calibration. On request, the utility will test a customer’… |
12.0213 Public information and requests. The public may obtain information and make re… |
12.0214 Current specifications-Three-phase availability-Equipment-purchase warning. (a) Power will normally be delivered at 120/2… |
12.0215 Application for service-Notice of contemplated installations. (a) Customers or prospective customers should… |
12.0216 Easement requirement. Consumers must execute or have the owner of t… |
12.0217 Installation charges. Installation charges for new service: Type of… |
12.0218 Deposits. (a) When, in the judgment of the utility, til… |
12.0219 Power line extension fees. There is levied a comprehensive fee to cover… |
12.0220 Delivery point-Defined-Approval-Multiple occupancy. (a) The delivery point is the point where the… |
12.0221 Delivery point-Designation-Anchorage for connections. (a) It is essential, in order to avoid errors… |
12.0222 Separate conductors with single drop. Where no accessible common meter location is… |
12.0223 Meter location. (a) For business houses normally open during… |
12.0224 Number of services and meters. The utility will connect only 1 set of servic… |
12.0225 Grounding requirement. Ground wires installed in accordance with the… |
12.0226 Meter equipment issuance. When the electrician is ready to wire the bui… |
12.0227 Inspection before energization. All wiring in all buildings must be inspected… |
12.0228 Noncomplying construction. The utility reserves the right to refuse serv… |
12.0229 Temporary services. (a) In ease temporary service is desired, the… |
12.0230 Termination of service. (a) Once service is established, the consumer… |
12.0231 Schedule A-Residential service. Schedule A Residential Service AVAILABILITY A… |
12.0232 Schedule B-Commercial and small-power Service. Schedule B Commercial and Small-Power Service… |
12.0233 Schedule LPI-Large-power service. Schedule LPI Large-Power Service AVAILABILITY… |
12.0234 Debt retirement and capital improvement surcharge. (a) There is established an interim debt reti… |